Capability gap

Data Platform capacity gap

Warehouse migration · gap opens September 28, 2026 · owner Priya Raghunathan, VP Engineering

18% below required capacityConfidence: high
Recommended plan

Close the near-term gap without over-hiring.

No single path closes this in time. Redeployment supplies capacity fastest from inside the team, a bounded contract covers the work that cannot wait, and the approved requisition stays open for the capability that has to outlast the migration.

Gap closure
18% → 6%
1.99 FTE of 3.0 FTE recovered
Cost band
$115K–$160K
ceiling $150K
Time to impact
2 weeks
first capacity from the contract
Durable capacity
1.9 FTE
still here after cutover

Capacity is scored across the delivery window from September 28, 2026 to cutover on December 19, 2026 — not at a single date, because the contractor leaves before the window ends.

Review what approval authorizes
Build

Redeploy one engineer into the migration workstream

Maya Chen moves from the billing pipeline to the migration workstream for the duration of the project, with a 6-week learning path covering schema translation and backfill validation.

Cost
$19K–$28K
Time to capacity
1.5–6 wks
Durable
0.9 FTE
Confidence
high
What happens
  • A development plan is drafted and assigned to her manager
  • Two seats are held on the Sep 14 learning cohort
  • A 1:1 agenda is prepared for the Sep 4 conversation
  • Two shadowing sessions are scheduled before the departing engineer leaves
What does not happen
  • No change to level, title or compensation
  • No entry is written to her performance record
  • Nothing is communicated to her by Current
People involved
  • Maya Chen
    Software Engineer II, Product Engineering
    Offered the assignment by her manager. She can decline.
  • Tomas Lindqvist
    Director, Product Engineering
    Makes the offer and absorbs a 0.6 FTE reduction for six weeks.
Assumptions
  • Maya Chen accepts the assignment. This is a conversation, not a system action.
  • Product Engineering can absorb a 0.6 FTE reduction for six weeks.
  • Learning path completion translates to 0.9 FTE effectiveness, not 1.0.
Human decision

Her manager offers it. She accepts or declines, with no penalty either way.

Borrow

Engage a contractor for a bounded migration package

One senior data migration contractor for 12 weeks, scoped to schema translation and backfill validation, ending at cutover with no renewal assumed.

Cost
$96K–$132K
Time to capacity
2–3 wks
Durable
None
Confidence
high
What happens
  • A bounded statement of work is drafted from the workstream scope
  • Worker-classification screen runs against the drafted scope
  • The approval packet is routed to Finance and execution stops there
What does not happen
  • Nothing is sent to a vendor before Finance approves
  • No headcount is created and no employee record is touched
People involved
  • Wes Halloran
    Finance Business Partner, R&D
    Must approve $96K–$132K of contingent spend before anything is sent.
  • Procurement
    MSA vendors 0031 and 0044
    Receive the request only after Finance approves.
Assumptions
  • A qualified contractor is available from either MSA vendor within 3 weeks.
  • The migration workstream can be scoped as a bounded package a non-employee can own.
  • Rate holds at the midpoint of the current MSA band.
Human decision

Finance approves the spend. Current cannot approve it under any delegation.

Buy

Keep the approved requisition active for durable capacity

Position 2291 stays open, unchanged in scope, level and band. Its target start moves to Nov 30 to match the actual pipeline. The contractor covers the near-term work, so this search optimizes for durable capability rather than speed.

Cost
$0 incremental
Time to capacity
11–17 wks
Durable
1.0 FTE
Confidence
medium
What happens
  • Target start date is updated on REQ-2291
  • The recruiting owner is told what changed and why
What does not happen
  • No candidate record is read, ranked or scored by Current
  • No change to the compensation band or approved budget
  • No candidate is advanced, rejected or contacted
People involved
  • Janine Okafor
    Recruiting Lead, Engineering
    Notified that the search brief has changed emphasis.
  • Priya Raghunathan
    VP Engineering
    Remains hiring manager of record.
Assumptions
  • Median time-to-fill of 11 weeks holds for this role and level.
  • Ramp to full effectiveness takes 6 weeks after start.
  • Approved compensation band is sufficient to close a candidate.
Human decision

Every candidate decision stays with the hiring team. Current does not participate in candidate evaluation.